Multiple orifices in valve prevent lock-up from Debris
Seal package has been designed specifically for ZTR’s and the construction industry
Front seal design allows you to run and test parts at high speed -1,000,000 cycle test in 5 weeks Vs AVM 16.5 weeksFloating Piston design has surpassed 1,000,000 cycles -industry standard 450,000 cycles maxSealed self centering dampers prevent dust/mud from binding the springsTwin tube (Short non-cavitating damper) has a no lock-up design and dual front seals